Bathroom renovation · Andorra The first luxury of the day.
You walk in half asleep and walk out ready for anything. A well-made bathroom is not the room a house keeps postponing: it is where every day begins. We build it to match.
Materials you can feel with your eyes closed
Solid stone basins, seamless microcement, timber treated for humidity, black or brushed-gold taps with real weight in the hand. In a small room you touch every material every day — so we make no concessions on any of them.
A short build, planned to the millimetre
A bathroom can be renovated in two or three weeks if everything is decided before work begins. Plumbing resolved at the root, waterproofing done properly and a schedule that holds: that is the part you never see, and it is what makes everything else last.
From guest cloakroom to master suite
A guest washroom with character, a family bathroom built to take the pace, or an attic suite with a freestanding bath beneath a skylight. Every bathroom has its role; we design each one for the job it has to do.
Let’s talk about your renovation.
What sets the price of a bathroom
The size, the existing plumbing, the quality of taps and surfaces, and whether walls or drains need to move. We break it all down line by line, with Andorra’s indirect tax (IGI, 4.5%) shown separately.
Frequently asked questions
How long does a bathroom renovation take?
Two to four weeks, depending on scope. Materials arrive before demolition begins — so the work never stalls.
Can I swap the bathtub for a walk-in shower?
It is the most common request and almost always possible. We take the opportunity to review the waterproofing and leave the drainage properly resolved.
Will I be without a bathroom during the work?
If the home has a second one, we keep it running. If not, we organise the job so the interruption is as short as possible — and give you the exact dates in advance.
Shall we talk?
Leave us a few details and we’ll call you to arrange the visit. One conversation, no obligation.
Or call us +376 666 078